The CHP project of Kuittila Power was initiated by the entrepreneur/farmer interested to decrease the energy costs and produce own energy for the farm and co-located company. One of his staff and a development company introduced the solution. The reference site and a manufacturer were visited, after which a feasibility study was carried out.

As there was positive result, the investment project was initiated and 35% co-financing negotiated from the local authority. The manufacturer provided the technical planning, and investor took care of micro DH network construction and required connections (with the electricity company). A local constructor made the building construction.

The investment initiated in April, was ready in October 2012. The first winter included only test-runs, as there was no available high quality wood fuel. In spring, own fuel supply (with dryer solutions from the reference site) was established and plant started operating.

The first year included technical operations to improve the performance; technical support was received through the manufacturer. The plant is operating now a 3 year at a roll, and received significant status of small-scale CHP demonstration in the region, nationally and internationally.

For more details see:

http://grebeproject.eu/wp-content/uploads/2017/09/Small-Scale-Biomass-CHP-Kuittila-Power-Finland.pdf

2018-08-01T14:50:30+00:00